ENERGY SECURITY

The power comes back. But what did you lose?

A one-hour power cut costs electricity-intensive industry in Sweden SEK 968,000 on average. That is fourteen times more than traditional measures show. We build energy systems that lower the electricity cost every day in normal operation, and build in island mode where the operation requires it, so that prioritised loads keep running when the grid fails and profitability holds.

Battery cabinet installed in the plant room of an office property in Malmö
300 kW / 300 kWh. Office property in Malmö, no on-site generation.

Security of supply

The state of the Swedish grid

An average says little. Even a one-hour outage costs more than most people expect, and the really long outages are becoming more common. The number of customers without power for more than 24 hours rose by 69 % in one year.

63 min
average outage time per customer per year
6,456
customers had outages longer than 24 hours in 2024, up from 3,824 the year before
SEK 968,000
average cost per hour of outage for electricity-intensive industry
11,500
customers of a single grid operator were without power for more than 24 hours after the storm in December 2025

Sources: Swedish Energy Markets Inspectorate, Security of supply in Sweden's electricity grid 2024 (Ei R2025:17) · Swedish Agency for Growth Policy Analysis (Tillväxtanalys), 2024 · Ellevio

The cost of an outage

Most people calculate the wrong figure

The Swedish Agency for Growth Policy Analysis asked 359 of Sweden's thousand largest electricity-consuming industrial sites what a power cut actually costs them. The answer was SEK 968,000 per hour. Traditional measures indicated SEK 68,000.

The difference lies in what doesn't show on the electricity bill:

  • The restart. A process that stops uncontrolled doesn't restart at the push of a button. Calibration, warm-up and scrapping of whatever was in the line.
  • The material. Cold chains, growing cultures, curing materials, batches in progress.
  • The commitments. Delivery penalties, SLA levels, production windows that can't be moved.
  • The staff. Paid time without production, and overtime to catch up.
  • The investigation afterwards. Hours spent by people who have other important work.
  • The next tender. Your customer's guarantee. The customer who wonders how you handled it and whether they can trust you to deliver on time.

BOTH PROTECTION AND REVENUE.

Protection that stands still is a cost. Protection that works is an investment.

A diesel generator does one job: it starts when the grid fails. For the rest of the year's 8,759 hours it stands still.

An energy system with on-site generation, battery storage and control does the same job during the outage and works in between. It cuts demand peaks, shifts consumption to cheaper hours and produces electricity on site. One investment, two sources of return.

Island mode

What happens when the grid fails

  1. 01

    The system detects the outage. The control registers that the grid is gone and switches to the prepared mode of operation. What is prioritised is decided in advance, not in the moment.

  2. 02

    The battery carries the prioritised load. Refrigeration, alarms, server rooms, control systems, access control, lighting in escape routes: whatever was defined as critical during design. Non-critical loads are disconnected so the capacity lasts longer.

  3. 03

    The solar panels top up when it's light. In daylight, production charges the battery during the outage. That is the difference between ordinary protection and protection that lasts for hours. In winter, the sun can be replaced by local wind generation. We work out the right solution for your site before you order.

  4. 04

    EcoHub logs the event. What happened, when, which load was carried and for how long. Evidence for your continuity plan and for the next round of sizing.

Method

How we design in island mode

Island mode is an optional add-on, but not a module you bolt on afterwards. Its scope, which loads are carried and for how long, is decided together with you and sized against measured consumption.

  1. 01

    Loads are measured, not estimated. We go through which functions must keep working and for how long. The basis is measured consumption. The result is a prioritised load list with power in kW and endurance requirements in hours.

  2. 02

    Sizing for the season. Battery capacity is calculated against the prioritised load in two scenarios: with and without solar. An outage in December is not an outage in June. You get both figures before you order, not just the more favourable one.

  3. 03

    Electrical design. Hybrid inverter, isolator from the grid, its own earth electrode and a separate backup distribution board with the prioritised load on its own circuit. The grid connection notification to the grid operator is included.

  4. 04

    Testing with a real grid outage. At commissioning, we disconnect the grid under load and measure what actually happens: switchover time, power carried and endurance. You learn what the system can do before you take it over, not what it should do according to the datasheet.

  5. 05

    Ongoing checks, because the system is in use. The battery works every day with peak shaving and price-based control. It is in operation and monitored, not just on standby and untested. EcoHub logs availability, state of charge and every switchover, and raises an alarm when something deviates.

Regulation

What the requirements actually say

Three sets of rules move energy security from an operational issue to a board issue.

The Swedish Cybersecurity Act (2025:1506)

implements NIS2. It entered into force on 15 January 2026 and covers eighteen sectors. Continuity and crisis management is one of its requirements.

The CER Directive

is being implemented through a new Swedish act on the resilience of critical entities (Government Bill 2025/26:303), proposed to enter into force on 1 January 2027. It covers eleven sectors: energy, transport, banking, financial market infrastructure, health care, drinking water, waste water, digital infrastructure, public administration, space and food. Whether an organisation is covered depends on whether it provides an essential service, not on its size. The requirement is to be able to prevent, withstand and limit the consequences of disruptions, and to report incidents.

Stricter preparedness requirements for municipalities and regions

are proposed to enter into force on 1 January 2027. Municipalities must, among other things, have access to designated gathering points for residents and be able to inform the public even without the internet. SEK 5.4 billion has been set aside for 2026–2029.

What it means in practice: none of these rules prescribes a particular technical solution. They require you to show that critical operations can be maintained, with evidence behind it. A site that logs every outage, every switchover and every load carried produces that evidence continuously, instead of having to compile it afterwards.

Results in operation

Measured, not estimated

We have helped businesses secure their operations against disruptions, outages and price swings in the grid. Here are some of them.

Office premises, Malmö

300 kW / 300 kWh battery storage, no on-site generation. Secured operation during power cuts and lower demand peaks.

Commercial property in northern Skåne, January–October 2026

Electricity bill 36 % lower, January–October 2026. Effective electricity price SEK 0.87 per kWh including frequency reserve revenue, against SEK 1.80 without the system. Within the main fuse limit in all 71 hours when demand was higher.

Large-scale farm

400 kW / 400 kWh batterilagring med lastprioritering.

Frequently asked questions

Questions about energy security

Do solar panels work during a power cut?

No, not in a standard system. The inverter automatically disconnects the system when the grid goes down, to protect people working on the grid. For solar PV and a battery to supply the property during an outage, it needs island mode: a hybrid inverter, an isolator, its own earth electrode and a separate backup distribution board. It is designed in when the system is sized.

How long does a battery last during a power cut?

Capacity divided by the power of the prioritised load. A 300 kWh battery carrying 50 kW lasts six hours in theory; expect somewhat less after conversion losses and the reserve left in the battery. Any solar production during the day extends the time. Sizing therefore starts with the load profile, not the battery size.

What does a power cut cost a business?

The Swedish Agency for Growth Policy Analysis asked 359 of Sweden's largest industrial sites. The average was SEK 968,000 per hour, compared with SEK 68,000 by traditional measures. The difference lies in restart time, scrapped material, delivery penalties, staff without production and investigation work afterwards.

Should you choose backup power or battery storage?

A battery if the outage needs to be bridged for hours and the system should earn its keep the rest of the year. A diesel generator if the operation must cope for several days without the grid. Both, if both apply: the battery takes over within milliseconds, and the generator takes over if the outage drags on. Always start from how long you need to cope, not from the technology.

How do you know island mode works?

By testing it, and by using it. At commissioning, the grid is disconnected under real load, and switchover time, power carried and endurance are measured in the finished system. After that, a battery that cuts demand peaks every day is in operation and monitored, unlike a generator that is test-run quarterly.

Do NIS2 or the CER Directive require backup power?

No. The Swedish Cybersecurity Act (2025:1506), in force since 15 January 2026, and the proposed act on the resilience of critical entities require organisations to maintain critical services during disruptions and to show how. Neither prescribes a technical solution. Backup power or energy storage is one way to meet the requirement, not the requirement itself.

Can island mode be added to an existing solar PV system?

Sometimes. What matters is whether the existing inverter can form its own grid. If it can't, it has to be replaced, and the addition becomes a rebuild rather than an upgrade. That is why it is cheaper to design in island mode from the start, even when backup isn't the main reason for the investment.

Can energy storage provide backup power for a community resilience point (trygghetspunkt)?

Yes, if the system is designed for island mode and sized for the functions it must supply, such as heating, lighting, communications, charging and any cooking. The advantage over a diesel generator is that no fuel needs to be stored on site, and that the system earns its keep the rest of the year. Endurance is shorter and must be sized deliberately.

An operational resilience review is free of charge and takes about 30 minutes. We go through your load profile, identify what must keep working and for how long, and calculate what an outage actually costs you. You get a decision-ready basis whether or not it becomes a project.

Prefer to call: +46 73 532 15 75

Next step

Find out what you are actually risking

Book an operational resilience review